Question:
I have a 160 meters houses, like decoration, but do not know specifically how to do a step by step, such as the upper and lower water, what to do first, what to do after the most Good to elaborate

Answer:
1 pre-design - 2 of the main Chaigai - 3 hydropower reform - 4 Wood - 5 tiling - 6 whitewashers coat - 7 Kitchen Ceiling - 8 Cabinet Installation - 9 doors installed - 10 Floor Installation - 11 Stones Wallpaper - 12 Radiator Installation - 13 switch sockets to install - 14 lights installed - 15 Metal Sanitary Ware Installation — -16 curtain rod installation - 17 pioneering Procter & Gamble - 18 Furniture approach - 19 Appliance Installation - 20 Household Accessories

renovation, largely completed in accordance with this 20-step installation
floors and doors to be interchangeable point, because the floor and then install the door Zhuang Wan, contact points are flat, first install the door and then install the floor, the floor in the corner of the door can not be without gaps.

装修具体步骤